• Room 1501-1503, Jinxiu Hongdu Building, in Minzhi Street, Long Hua District
  • Shenzhen, Guangdong, 518131
  • Çin
  • Tel:0755 26985379
  • Faks: ---.---.-----
  • Web adresi:

Industrial SSD

Sabit diskler

$ 10 USD / Parça

Yeni

Mevcut değil

Mevcut değil

Sormak

Ürün tanımı

The standard storage solution for most embedded systems. SSDs come in a wide variety of form factors including 2.5", 1.8" and others.

Specifications About YANSEN Industrial SSD

Power Loss Protection (PLP)

When the power supply is unexpectedly disconnected, the voltage will begin to drop, When the voltage drops to 3V/4V, SSD will use its own backup capacitor for discharge to maintain the data on the written link.

End To End

Data Protection.

AES Encryption

Compared with software encryption, hardware AES encryption provides better data protection and efficiency for the applications that process more sensitive data or need to improve the data security. Support AES128/256 and ATA security Password.

Stable SSD Enterprises

The server often works long time and ensures the stability of the data.

FAQs Related To YANSEN SSD

What's the material YANSEN industrial SATA SSDs use? such as controller , NAND brand?

For all YANSEN industrial temp SSD we use industrial grade controllers, 100% original NAND flash, and other components are wide temp. grade(power IC, RES, CAP, IND), the brand of the controller is Silicon Motion, Hyperstone, Phison, Marvel, and for NAND flash, Intel, Micron and Kioxia is the main brand.

What kind of tests will be done on YANSEN industrial solid state drive?

There are lots of strict tests during the production process to ensure each industrial solid state drive's reliability and stability in a rugged environment. Like wide temp. (-40~85℃) test, High temp. RDT test, Drop Test, Vibration Test, BIT Test, PLP test, Salt Spray Test, etc.

What's the lead time of common industrial orders?

For industrial wide temperature SSD drives, there don't have stock usually, we need 10~15 days for common orders, if bulk orders such as 1000pcs or more, or customized model, we need 30 days time.