• 18-7, lashan industrial park
  • Jinan, Shandong, 250022
  • จีน
  • โทร:86-531-87586199
  • Skype:dolang-didactic
  • url:

Level Process Control Training Equipment educational training equipment

อุปกรณ์การศึกษา

เมื่อร้องขอ

ใหม่

1 (s) ปี

จีน

สอบถาม

รายละเอียดของสินค้า

Level Process Control Training Equipment

I. System overview

DLGK-YW101 Flow control training system, including control cabinet and process control unit. The training system is based on physical simulating objectof industrial process. Which involves PLC control technology, computer technology, communications technology, automatic control technology, integrated multi-function experimental device, the system is mainly used to measure control and execution of liquid flow in pipes. It can complete system parameter identification, single-circuitcontrol and so on. The experimental device can be used as undergraduate, college, vocational curriculum process control device, but also suitable for graduate students and researchers to study physical simulation and experimental study of objects of complex control systems, advanced control systems.

The system meet the traching requirement of "Automatic control theory", "Process control", "Automation instruments" "Automatic measurement technology and sensors" and "computer control".

The process training system can practice vertification experiments, design experiments, also support comprehensive training. The system is equipped with standard industrial instruments and flexible device.

II. System Features

1. Single-phase three-wire AC power supply

2. Power Supply with leakage, overvoltage, overcurrent, short circuit protection, protection the user against electric shock.

3. Open structure design, with experimental subjects intuitive and strong, easy to understand.

4. Design of hardware objects fully consider its deterministic mathematical model, consistent with the theoretical teaching.

5. Instrument parameters and characteristics meet the design requirements of the system, with ideal experimental results.

6. Instrumentation assembly and disassembly to practice the skills

7. Various control signals, various control signals and control method are available according to training content.

8. Water and electricity are independent. That is the control unit and executive unit is separate. The wiring of executive unit with protection against water.

9. DIY training projects are available.

10. Man-machine interactive experiment. With confirguration software to complete interactive operation.

1. Input voltage: Single-phase three-wire 220V ± 10% 50/60Hz

2. Operating environment: Ambient temperature range -5 ~ 40 ° C

3. Installed capacity: AC


นำเข้า / ส่งออก

1.00 ชิ้น

อดีตทำงาน, ผู้ให้บริการฟรี, ฟรีควบคู่ไปกับเรือ, ฟรีบนเรือ, ค่าใช้จ่ายและการขนส่งสินค้า, ค่าประกันภัยและค่าขนส่ง

T/T, L/C