Beijing Hyliton Power Technology Co.,Ltd. announced a new event
Procedure For Fitting Fault Passage Indicators On 33kV Conductors Hot Stick Method Beijing Hyliton Power Technology Co.,Ltd | Updated: Jul 18, 2017]
APPROVED TOOLS Approved tools and equipment to carry out this procedure are as follows: 1 8ft Grip-all Clampstick 1 8ft Universal Stick with attached mirror 1 8ft Universal Stick Rotary Prong 1 8ft Wire holding Stick (All Short Sticks used to carry out this procedure shall have red marker tape 0.8mtr from top) HOT STICK PROCEDURE CARRIED OUT FROM AN I.A.D. Before commencing refer to 5.2 section 4.3 of the PSLWM Carry out a visual inspection both spans either side of work position. Carry out a mirror inspection of the insulators, binders etc. to ensure their integrity. Attach the wire holding stick to the centre phase conductor 2 metres from the pole on the side being worked on. This will enable the linesman to maintain the required safety clearance from the conductor while working away from the pole. Working below the red marker band on the wire holding stick, work can now commence fitting the CHK LT40 to the phase conductors.